full screen background image

Update

June 3, 2022: Water levels are continuing to rise, we have seen an approximate five foot (5') water level increase near Watershops Dam. The more rain we get, the quicker the water levels will rise.  The contractor is continuing finish work along the training walls leading up to the dam. Work over the past week includes installation of re-bar to prep for concrete pouring, installation of guardrails along the training walls and installation of debris-guards to protect the water control gates from damage.

Lake Massasoit Dam Upgrades

Lake Massasoit Community Cleanup Facebook Link

 

© 2022 East Forest Park Civic Association   |  Joomla Templates by Joomzilla.com
Back to Top